Installation
1. Shut down TIBCO iProcess Engine.
2. Back up the following existing files to a safe location that should be
outside of the $SWDIR directory:
- $SWDIR/libs/libswxml.so
- $SWDIR/libs/libimplib.so
- $SWDIR/schema/xpdl2xfr/xpdl2xfr_Activities.xslt
3. Copy the following files from the given package overwriting the existing
files, and leaving the permissions and ownership as they are.
- libswxml.so
- libimplib.so
- xpdl2xfr_Activities.xslt
4. Edit the existing $SWDIR/swdefs line 1 to i11.9-o(0.4)
5. Restart TIBCO iProcess Engine.
===============================================================================
Affected Files for 11.9.0_HF-004 (This Release)
- libswxml.so
- libimplib.so
- xpdl2xfr_Activities.xslt
===============================================================================
Closed Issue in 11.9.0_HF-004 (This Release)
IPE-6172
Any expression defined in a client for example Business Studio, that once
translated to the native iProcess expression language, if the resulting
expression is longer than 245 characters, then the deployment will be aborted
and "IPEXPDLXFRERR" error is returned back to the client.
Corrected.