How can we have multiple TIBCO IntegrationManager (IM) engines with SOAP job creators and their jobs in ACTIVE status?

How can we have multiple TIBCO IntegrationManager (IM) engines with SOAP job creators and their jobs in ACTIVE status?

book

Article ID: KB0092508

calendar_today

Updated On:

Products Versions
TIBCO IntegrationManager -
Not Applicable -

Description

Description:

Running Soap JC on multiple TIBCO IntegrationManager (IM) engines to implement Soap JobCreator in load balance mode. 

Resolution


To achieve Soap JobCreator to run into load balance mode by running multiple IM engine, you have to set the following property in the .cfg file.

Config.JobCreator.SOAP.runOnAllEngines: true

Issue/Introduction

How can we have multiple TIBCO IntegrationManager (IM) engines with SOAP job creators and their jobs in ACTIVE status?