TIBCO BusinessWorks 5.2.1 Hotfix 4 is available

TIBCO BusinessWorks 5.2.1 Hotfix 4 is available

book

Article ID: KB0105492

calendar_today

Updated On:

Products Versions
TIBCO ActiveMatrix BusinessWorks -
Not Applicable -

Description

Description:
The patch can be downloaded from the TIBCO Support ftp server, support-ftp.tibco.com. Please use your eSupport username and password to access the server. After connecting, go to /available_downloads/ActiveEnterprise/BusinessWorks/BW/5.2.1/hotfix-04/  to download the appropriate hotfix for your OS/platform.

It is recommended to also download the TRA HF - 04 from our support-ftp.tibco.com site.

The issues which are fixed in BW 5.2.1 HF 04 are :

  Defect Id: 1-6NGTS3
    Manage Connection for BW Workflow failed randomly with
    "Output Data Invalid" error. This has been fixed.

  Defect Id: 1-6IOLDN
    Fixed a reconnection issue to JMS servers.  The connection
    was re-established, but some of the JMS operations may continue
    to report errors.
  
  Defect Id: 1-6LTWHN
    Fixed the problem in which the onProcessRemoved callback function
    did not return any data.

  Defect Id: 1-6MBNI5
    To supplment the fix made in Hotfix 3 to cover more generic
    cases.
  
  Defect Id: 1-6OJLSZ
    Addressed an issue in the 'TCP read' activity where some incoming
    data may be lost when too much data is coming through.
  
  Defect Id: 1-6N5O85
    In some cases, the SOAP activities are not releasing memory
    after job completes.

  Defect Id: 1-6M3FQP
    Internal fix.

  Defect Id: 1-6OJWUY
    Internal fix.

  Defect Id: 1-6OEUA3
    When using JMS client ack mode, the engine sometime stops processing
    messages from the queue.

  Defect Id: 1-6OEUD9
    Wait/notify and checkpoint activities do not reinitialize stale DB
    connections in the connection pool.

Environment

Product: TIBCO BusinessWorks Version: 5.2.1 OS: --------------------

Issue/Introduction

TIBCO BusinessWorks 5.2.1 Hotfix 4 is available