book
Article ID: KB0103911
calendar_today
Updated On:
Description
Description:
Product Name : TIBCO ActiveMatrix(R) BPM
Release Version : 1.2.0_HF-007
Release Date : August 2012
================================================================================
Hotfixes are cumulative. This hotfix includes the issues listed in the Closed
Issues sections.
================================================================================
This hotfix applies to the following products and versions:
- TIBCO ActiveMatrix BPM 1.2.0 and subsequent hotfixes up to and including
1.2.0_HF-005.
================================================================================
Closed issues in 1.2.0_HF-007 (This Release)
BX-2310
Business Data Services and Business Object Models complex objects need to be
serialized. This is to avoid issues with processes calling different versions
of Business Object Model classloaders in different projects.
BX-2276
If an application that is implementing a service is upgraded, and then version
1 of the application is stopped or undeployed and the node restarted, then
version 2 of that application creates new service entries. This means that all
the messages that were previously sent before the node was restarted to its
receive tasks will not correlate and therefore not be sent.
BX-2256
If a module is deployed and then stopped, it can cause two problems:
Problem 1
If you have:
* a process definition with a non-message start event and no input parameters
deployed to your node, and
* your node is stopped before an instance of the process definition has been
started
when the node is restarted, an exception is thrown whenever you try to start an
instance of that process definition.
Problem 2
TIBCO Openspace does not display templates and the TIBCO ActiveMatrix BPM log
displays "a Module [NAME] with version [VERSION] not found" error.
BX-2094
Errors encountered while cancelling a process should not prevent a cancel
request from proceeding. A cancelled process should delete inactive
sub-processes.
BX-2080
When using QueryProcessInstances, an OR filter of process instance IDs returns
an empty result if any one of those IDs does not exist.
BX-2064
Completed sub-processes are still listed as Completed after their parent process
has been cancelled.
FORM-5332
Removed tabbed navigation support for Label, Image and Passthrough controls.
This is because it slows down completion of the form. As these fields are read
only tabbed naviagation is not required.
FORM-5160
Incorrect numeric formats in the common resource bundles for some language
packs mean that numbers, currencies etc may not display correctly.
FORM-5121
Setting the DateTimeTimezone value in a script task and assigning it to a
Business Studio user task throws an exception.
The Time and Offset displayed in the datetime and DateTimeTimezone fields in
Forms are incorrect.
FORM-5007
Forms cannot display a BOM date field that contains 'Z' - for example,
'2012-03-05Z'.
OS-1085
Fixed the size of user session timeout popup dialog.
PVM-341
If you have an embbedded sub-process that consists of some steps and a
loopback, the first step processes correctly but the second step fails with
a "Virtuals being instantiated may not have a multi-instance ancestor:" error.
PVM-312
Process Manager does not recover fully after a database outage: some process
instances are not at the correct status.
WRM-3607
-Dcom.tibco.bx.suspendOnError is set automatically to Yes for new BPM
installations on BPMNodes.
WRM-3209
Metadata changes made for pageflow engine.
WRM-3204
Ensure that the EPackage Registry is always registered with the appropriate
bundle before use. Otherwise using the EPackage to create instances will result
in classloader issues.
WRM-3203
If the BPM application server URLs are accessed using a Reverse Proxy, so that
clients would access the proxy server and not directly access the BPM application
server, steps must be taken to ensure that the client uses the correct URL to
locate forms on the BPM server.
1. In the wpextender.properties file set the UseHttpRequestContextURL property
to false.
2. In the wpextender.properties file, set the property formContextURL to the
URL for the forms, in the format:
formContextURL=<protocol>://<hostname>:<port>/<context>
where
<protocol> is http or https
<hostname> hostname or the IP address of the proxy server
<port> is the port on the proxy server
<context> is the context where BPM forms are stored. It is bpm up to
ActiveMatrix BPM 1.1.0, but is bpmresources from ActiveMatrix BPM 1.2.0
If you have user applications deployed both from 1.1.0 and 1.2.0, for the
Forms to load up correctly, you must omit the context but it
is mandatory to include the slash after the port number. For example:
formContextURL=https://10.100.253.253:8080/
This enables your users to open forms for work items related to both the
pre-upgrade and post-upgrade versions of BPM.
WRM-3192
Remove import of net.sf.ehcache feature to avoid OSGI wiring conflicts on upgrade.
WRM-3153
When multiple versions of custom email templates exist, BPM may fail to use the
correct template to send mail.
WRM-3149
Running the upgrade node command makes the application amx.bpm.app go into the
"start failed" state.
WRM-3059
If an error occurs while processing an event, the event thread exits. This
results in some work item events not being processed.
WRM-3019
The Reallocate to World function does not work if the original offer set for
the work item is either invalid or empty.
================================================================================
NOTE: Please check the Readme document for installation instructions and issues resolved in previous hotfix releases.
================================================================================
The TIBCO ActiveMatrix(R) BPM 1.2.0 Hotfix 07 can be downloaded from our support-ftp.tibco.com. You will be able to download by clicking on the link below after you provide your TIBCO Support Web username and password in the url:
ftp://username:password@support-ftp.tibco.com
Directory path:
available_downloads/ActiveMatrixBPM/ActiveMatrixBPM/1.2.0/hotfix-07
================================================================================
Issue/Introduction
TIBCO ActiveMatrix(R) BPM 1.2.0 Hotfix 07 is available.
Environment
Product: TIBCO ActiveMatrix BPM
Version: 1.2.0
OS:
--------------------