TIBCO BusinessWorks Process Monitor 2.0.0 Hotfix 3 now available

TIBCO BusinessWorks Process Monitor 2.0.0 Hotfix 3 now available

book

Article ID: KB0104048

calendar_today

Updated On:

Products Versions
TIBCO BusinessWorks ProcessMonitor -
Not Applicable -

Description

Description:
Product Name:         TIBCO BusinessWorks Process Monitor
Release Version:      2.0.0_HF-003
Release Date:         February 2013
======================================================================
Introduction

Hotfixes are cumulative. This is the third hotfix for TIBCO BWPM 2.0.0
This hotfix consists of 2 parts:
- bwpm client lib (bwpm.jar). Put this file in the {TIBCO_HOME}/bw/5.x/lib/palettes, effectively replacing any existing bwpm.jar file and restart the BW engine(s).
  Note: If you use BusinessWorks running under JRE-5 please use bwpm_5.jar instead of bwpm.jar
- bwpm server (bwpm_server_hotfix03.zip). Please follow on the installation instructions below
- TIB_BWPM_2.0.0_readme_hotfix03.txt (this file)
=======================================================================
Closed Issues in 2.0.0_hotfix03 (This Release)

    #669: the toolbar on top of activities in the process diagram had no tooltips
    
    #687: the bwpm client would open too many (up to 20) JMS connections. This has been fixed, so that the bwpm client uses exactly one connection now
    
    #691: if regex rules were defined in the TRA file and would trigger on activities with no output data, a null-pointer exception was thrown

    #692: if an extract was configured for a start activity of a subprocess, the extract would only work, if tracing was enabled for this activity        
    
    #696: the search related "from" date was not respecting the browser's timezone, but was always using UTC for date calculations triggered by the date buttons to its left
    
    #698: fixed an issue that would result in "maximum open cursor exceeded" errors
    
    #699: large installations could experience domain object id collisions
    
    #700: in "exclusive" log mode, when activities had extracts configured, the process would still not be monitored by the bwpm client
    
    #701: when the TIBCO Designer tester took long to initialize a test session, the bwpm client would not register correctly
    
    #703: when the BW engine would take very long to initialize, the bwpm client would not register correctly with the engine and not monitor processes
=======================================================================
To see the complete readme file which includes the issues addressed in earlier hotfixes as well as installation instructions please refer to the attached document.

You can downlaod this hotfix from: ftp://support-ftp.tibco.com/available_downloads/ActiveEnterprise/BusinessWorks/Plugins/BWPM/2.0.0/. You will be challenged for your TIBCO eSupport username and password in order to access the site.

Issue/Introduction

TIBCO BusinessWorks Process Monitor 2.0.0 Hotfix 3 now available

Environment

Product: TIBCO BusinessWorks ProcessMonitor Version: 2.0.0 OS: --------------------

Attachments

TIBCO BusinessWorks Process Monitor 2.0.0 Hotfix 3 now available get_app